Performance Characteristics and Pouring Order of Concrete Pump
Date: May 15, 2015 Source: admin
Concrete pump is equipped with high pressure clean equipment, which can be cleaned quickly and conveniently. Self-lubrication in bucket and cylinder. America PARKER seal parts, very thick chromium coat inside cylinder which makes sure 20,000m3 concrete output. High low pressure conversion valve with patent, reduce the pressure on main hydraulic system and improve system efficiency with 20%.
The followings are the performance characteristics of concrete pump:
1. Triple pump system. There is no mutual interference between hydraulic circuits and system runs normally.
2. Anti-pumping function. It is beneficial to eliminate the fault of pipe plugging in time and stop to feed materials in a short time.
3. Advanced S-pipe distribution valve. It can compensate the wear clearance automatically has good sealing performance.
4. Adopted with wear-resistance alloy materials, the glass-like plate and floating cutting ring have long longevity.
5. Long stroke material cylinder can prolong the service life of material cylinder and piston.
6. Optimized design hopper is easy to clean and it has a better material absorption performance.
7. Lubricating system is centralized automatically which can ensure the machine is effectively lubricated during the operation.
8. The remote control function makes the operation more safe and convenient.
9. All accessories which conform to national standards have a better interchangeability.
The pouring order should meet the following requirements:
1. The pouring should be from far to near when users deliver concrete with pipeline.
2. When delivering concrete in same area, the concrete pump adopts the layered continuous pouring, which is from vertical structure to horizontal structure.
3. When it is not allowed to have construction joints, concreting intermission time between regions and the upper and lower levels should not exceed the initial setting time of concrete.
4. After the initial setting time of the lower level concrete, users should deal with according to the regulation of construction joints when they pour the upper level concrete.
5. It is necessary to divide well the concrete pouring regions in advance according to features of engineering structure, plane shape, geometry size, ability of concrete supply and pumping equipment, labor force, management ability and size of surrounding area.
Tags: CONCRETE SHOW SEA INDONESIA 2019concrete batching plant for salecheap concrete mixertranscrete concrete line pumps for sale boom pump truckpump machine
Previous: Reliable Performance of HZS120 Concrete Batching Plant
Next: Mobile Concrete Mixer Improves Production Capacity
NEWS
- DHBT15 Diesel Engine Concrete Mixer with Pump was delivered to North America
- Hamac 35m3 concrete batching plant delivering to the African customer
- Hamac HMC150 self loading concrete mixer delivering to the Middle East
- 2 units of 10 m3 transit mixer trucks are delivered to South Africa
- TWO UNITS OF HGY15 CONCRETE PLACING BOOM WAS DELIVERED TO EUROPE
- 4 Units of bolted type cement silos were delivered to South East Asia
- Reliable Performance of HZS120 Concrete Batching Plant
- Low Price Small Size Concrete Pump for Saudi Arabia
- An Independent Off-road Mobile Batching Plant
Products
Concrete Mixers
Concrete Batching Plant
Concrete Conveying Plant
- Truck Mounted Concrete Pump
- Elevator shaft Self-climbing Concrete Placing Boom
- Mobile Hydraulic Concrete Placing Boom
- Floor climbing Hydraulic Concrete Placing Boom
- Concrete Transit Mixer on Truck
- XBS/DXBS Fine Stone Concrete Pump
- Concrete Mixer Truck
- 6cbm Concrete Truck Mixer
- Manual Concrete Placing Boom
- 8cbm Concrete Truck Mixer