Suspension roller process
(1) steel skeleton displacement deformation
In the process of the suspension roller process, due to the use of dry hard concrete, steel skeleton by the larger radial pressure, and with the feeding side of the rolling and rotation process, repeated role is gradually strengthened, resulting in Skeleton deformation, displacement. The way to avoid this is to enhance the overall rigidity of the steel frame, to strengthen the fixing of the skeleton in the pipe mold, and to control the steel bar of the protective layer into the U-shaped steel bar and increase the error to about 2mm.
(2) the inner and outer walls collapse
The phenomena of wall collapse, wall separation and pipe - die separation are the quality problems of suspension pipe, especially in the environment of low temperature. With the increase of diameter, the self - arching effect of circular arc decreases. Wall thickness increased, the upper part of the concrete gravity increased. While lifting the process of vibration, it is necessary to produce wall collapse, the outer wall from the mold off. Avoid the way is: try to produce the diameter of 1000mm below the strict control of water-cement ratio and reduce the vibration generated during the lifting process while prolonged listening time.
Configuration notes for equipment
Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:
- correctly sized main machine for the required output
- material feeding and conveying system
- control system with manual and automatic modes
- wear parts package matched to the material
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the quoted capacity is achievable with your actual material
- check the core component brands and the wear part material
- verify the power supply and foundation requirements on your site
- ask what commissioning and operator training is included
- confirm spare parts availability and typical delivery time
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.