Wire cage welding machine used in the production of steel cage, put the tube in the cement machinery mould system for the production of a reinforced concrete pipe, but in actual use may appear may appear unstable failure of welded steel, the following is the analysis of cause of trouble and remedy method.
Fault:
1, steel surface oil and corrosion.
2,. Welding wheel too groove
3 deep groove welding wheel, welding wheel or conductive wheel pressure is too small
4, conductive block or conductive wheel wear.
5 welding of two primary side of the transformer connected copper foil, poor contact steel, the contact surface oxidation or the fastening screw loosening.
6 conductive copper sleeve groove deep, loose slot, dirty.
7, welding voltage is too low. Method: to replace steel or pickling processing; car repair; adjustment; replacement or repair; clean and tighten; replacement tank; adjust the voltage.
Configuration notes for equipment
Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:
- correctly sized main machine for the required output
- material feeding and conveying system
- control system with manual and automatic modes
- wear parts package matched to the material
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the quoted capacity is achievable with your actual material
- check the core component brands and the wear part material
- verify the power supply and foundation requirements on your site
- ask what commissioning and operator training is included
- confirm spare parts availability and typical delivery time
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.