O &M attention of air-compressor for concrete batching plant

Home/ News/ Product Knowledge/ Article
Product Knowledge Editorial review by HAMAC
1. Working condition for air-compressor shall be clean and dry. The air tank shall be put in the well ventilation position. Weld and heat treat work are not allowed within 15 meters diameter range;

2. Air tank and air piping shall be took hydrostatic test per two years, pressure gage and safety valve shall be tested per year;

3. Air-compressor shall be started under no-load condition, when it work normally, load operation is allowed;

4. The air piping shall be connected well before open the air supply valve, the piping system shall be unblocked and warped;

5. The maximum air pressure in air tank shall be not exceed the data showed on the label;

6. Air input valve, air output valve, bearing and other parts shall be without abnormal sound or superheat;

7. The air compressor shall be stopped immediately if the following situation happens; water leak, air leak or electricity leak; pressure gage, temperature meter, currency meter data exceed normal data; output air pressure rise suddenly etc;

8. If stopped caused by air cylinder superheat because of water shortage, you are not allowed to add water immediately. Water shall be added when the temperature of air cylinder is lower than 60℃;

9. The load shall be discharged before being stopped, then separate main clutch, and then stop the engine or motor;

10. The residual air shall be discharged after work finishing, the coolant shall be discharge also according to the different seasons temperature;
Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.