The maintenance of concrete mixer is very important for concrete mixer owner, because it is directly relevant to the service life and efficiency
of a concrete mixer. We will give some advice on maintenance of concrete mixer.
1. Lubricate the bearing parts regularly according to its service condition. Adopt calcium soap grease to lubricate it. Adopt engine oil to lubricate reducer.
2. Check the sealing of concrete mixer regularly. Inspect the quality of sealer in time when leakage is found.
3. Examine securing device frequently. Tighten up it the moment it becomes less crowded.
4. Inspect the control system constantly to guarantee its good contact and dry it frequently.
Configuration notes for mixer
A self-loading mixer removes the need for a separate batching plant and wheel loader on small and remote sites, but the batch cycle is longer, so daily output depends on travel distance on site. In practice, the delivered scope for this type of work usually includes:
- drum with hydraulic drive and reversible discharge
- front loading shovel with hydraulic lifting and tipping
- four-wheel-drive chassis rated for rough site roads
- weighing and water dosing system for consistent batch quality
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the drum volume and the actual mixed output per batch
- check whether the loading shovel can reach the aggregate stockpile height on your site
- verify the chassis and axle rating for the road conditions you will use
- ask about water dosing accuracy and how the operator sets the mix ratio
- confirm spare parts availability for hydraulic pumps and drum seals
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.