The operation of the excavator bucket is actually not difficult. The purpose of regular excavator maintenance is to reduce the failure of the excavator, but the maintenance of the bucket has troubled many people and prolongs the service life of the excavator. However, in the actual maintenance process, the maintenance by the hands of the excavator is not good, and the maintenance often becomes "damage". Today, the editor will take a look at the practices that "harmed" excavators. Let's take a look!
1. Improper starting method can cause serious damage to the machine. In winter, an abnormal starting method without water (start first, then add cooling water) is often used. This practice can cause serious damage to the machine, and its use should be prohibited. The correct preheating method is: first cover the heat preservation quilt on the water tank, open the drain valve, and continuously pour 60-70℃ clean and soft water into the water tank. Some drivers can quickly start the diesel engine and touch the water flowing out of the drain valve with their hands. When you feel hot, close the drain valve, pour 90-100℃ clean soft water into the water tank, and shake the crankshaft so that all moving parts are properly pre-lubricated before starting.
2. Random selection of fuel reduces the life of the engine, resulting in a decline in the power and economic performance of the diesel engine. Therefore, light diesel with low freezing point and good ignition performance should be used in winter. Increase the probability of damage. The low temperature in winter makes the fluidity of diesel oil worse, the viscosity increases, and it is not easy to spray, resulting in poor atomization and incomplete combustion. Generally, the freezing point of diesel engines should be lower than the local minimum temperature of the current season by 7-10°C.
3. Not paying attention to body heat preservation reduces the working life, so heat preservation is the key to good use of diesel engines in winter. Damage to the engine The low temperature in winter can easily cause excessive cooling of the diesel engine during operation. In the northern regions, diesel engines used in winter should be equipped with cold-proof equipment such as insulation sleeves and insulation curtains.
4. If the oil pan is baked with an open flame, the machine will be burnt, or even scorched, and the lubricating performance will be reduced or completely lost, which will aggravate the machine's wear. It may aggravate the abrasion of the machine to avoid deterioration of the oil in the oil pan. In winter, low-freezing point oil should be used. When starting, the temperature of the oil can be increased by heating in a water bath outside the machine.
5. The machine is seriously worn out due to low-temperature load work. After the diesel engine starts to catch fire, some drivers can't wait to put into load work immediately. Diesel engines that have caught fire soon, due to the low body temperature and high oil viscosity, the oil is not easy to fill the friction surface of the moving pair, which will cause serious wear and tear of the machine. In addition, plunger springs, bucket valve springs and injector springs are also prone to breakage due to "cold brittleness".
Need help applying this to your project?
Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.
Questions about this topic
How do I choose batching plant capacity?
Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.
Which mixer type should I choose for my concrete?
Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.
How often should wear parts be replaced?
Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.
Can the plant be upgraded later?
Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.
H
HAMAC Machinery Editorial Team
Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.