1. If the force generated by the falling bucket is used for impact operation, it is easy to cause excessive load on the bucket, working device and frame, thereby shortening the service life of the machine. If the force of falling is used to work on the rock, it will produce a huge impact on the joint between the forearm and the bucket, causing cracking.
2. If the rotation force is used to move large objects, when the side wall of the bucket collides with the object, the chance of cracks in the frame is much higher than in normal use. The pressure on the link between the big arm and the forearm is normal operation 25 Times. Therefore, for machinery, this force will undoubtedly exceed the design capacity of the machinery itself, and will seriously affect the service life of the machinery.
3. When working, some people will use the principle of leverage to make the bucket pry the animal body. This will cause a force several times higher than the oil pressure to act on the bucket teeth, which may cause the bucket teeth and the bucket tooth seat to be produced. Cracks, breakages.
Configuration notes for equipment
Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:
- correctly sized main machine for the required output
- material feeding and conveying system
- control system with manual and automatic modes
- wear parts package matched to the material
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the quoted capacity is achievable with your actual material
- check the core component brands and the wear part material
- verify the power supply and foundation requirements on your site
- ask what commissioning and operator training is included
- confirm spare parts availability and typical delivery time
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.