Reasons for bucket failure:
1.The right PPC valve stick oil path is blocked.
2. The spool of the bucket control valve is worn.
3. The bucket compensation valve is damaged.
4. The spool of the suction valve of the Carter excavator bucket is stuck or the spool is worn, or the seal of the suction valve of the bucket is damaged.
5.The backup valve of the LS shuttle valve fails.
6.The oil passage of the bucket is blocked and the oil supply is not smooth.
Repair method of failure:
1.The bucket control lever is in the middle position, the PPC output pressure is 0; the bucket is digging or unloading, the PPC output pressure is 2.9mpa.
2. Check that the spool in the control valve of the excavator bucket is not worn, the spool of the suction valve of the bucket is not stuck, and the seal is not damaged.
3.Check that the LS shuttle valve of the backup valve control valve is working normally.
4. Turn off the excavator engine, and operate the excavating action of the bucket when the engine is at a high idle speed. The measured oil leakage of the bucket excavation overflow cylinder is 15cc/min, and the specified 20cc/min is low. The troubleshooting method: clean up Unblock the oil path of the excavator bucket
Configuration notes for equipment
Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:
- correctly sized main machine for the required output
- material feeding and conveying system
- control system with manual and automatic modes
- wear parts package matched to the material
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the quoted capacity is achievable with your actual material
- check the core component brands and the wear part material
- verify the power supply and foundation requirements on your site
- ask what commissioning and operator training is included
- confirm spare parts availability and typical delivery time
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.