Complete equipment of Spun Pre-stressed Concrete Pole and pile and Concrete Batching Plant. Provide turnkey project for the design and consultation of manufacturing SPC pole & pile, decorative poles, transmission pole & street lighting poles plant. Supply all necessary ancillary equipment from spinning machines, cage welding machines, buttonhead forming machine, wire handling equipment, conveyor system, filling stations, molds, pre-stressing equipment, lifting beams, coil stands, inserts, etc.
Configuration notes for batching plant
Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging. In practice, the delivered scope for this type of work usually includes:
- twin-shaft compulsory mixer sized to the rated output
- aggregate batching machine with 3 to 4 hoppers and load-cell weighing
- cement silos with screw conveyors and butterfly valves
- PLC control cabin with automatic and manual operation modes
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
- verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
- check steel plate thickness of the mixer shell and the batching hoppers
- ask which brand of load cells, reducers and pneumatic valves is used
- confirm the control system supports recipe storage and production reports
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.