Complete manufacturing systems for the entire building material and pre-cast concrete industry. Supply, plan and implement complete systems for the manufacture of the following products:
Floor Slabs / Double Walls
Solid Walls / Solid Floor Slabs / Facade Elements
Hollow Core Floor Slabs / Hollow Core Walls (not pre-stressed)
Columns, Beams and Double-Ts
Concrete Pipes and Reinforced Concrete Pipes
Reinforced Concrete Sleepers
Sand-lime brick
Aerated Concrete
Brick and Ceramics
Configuration notes for block machine
Block quality is decided by the mix design and vibration consistency, not by machine size. Inconsistent aggregate grading is the most common cause of weak blocks and high breakage rates. In practice, the delivered scope for this type of work usually includes:
- vibration table with adjustable frequency and amplitude
- hydraulic mould changing system for different block sizes
- pallet feeding and stacking system
- material batching and mixing unit ahead of the machine
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the cycle time per pallet and the number of blocks per pallet for your target size
- check the vibration system type and whether it suits your aggregate and cement ratio
- verify the pallet size and the cost of replacing pallets over time
- ask about the curing arrangement needed to reach handling strength
- confirm the total connected power and whether your site supply can support it
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.