Earth-moving Machines

Are there any tips to make the digging ability stronger

Home/ News/ Earth-moving Machines/ Article
Earth-moving Machines Editorial review by HAMAC
In the process of using the bucket, are there any tips to make the digging ability stronger? First of all, during the operation of the excavator, especially the bucket, the driver should pay attention to the method of cyclically pulling the lifting and turning bucket control levers to fill the bucket with materials when the throttle is stable.

The factor that can really improve the digging power of the bucket is coordination, so what is coordination? Coordination is the organic cooperation between the lifting and the bucket control cylinder. The general shoveling process of an excavator is to first place the bucket on the ground and drive to the material pile steadily.

During the work of the excavator bucket, it is forbidden for any person to stay or walk within the radius of gyration or under the bucket. Non-drivers are not allowed to enter the cab and move around, and they are not allowed to train drivers to avoid damage to electrical equipment.

When the excavator is moving, the driver should first observe and whistle before moving to avoid accidents caused by someone near the machine. After moving, ensure that there are no obstacles in the space of the excavator's radius of rotation. After the excavator enters the construction site , The driver should first observe the geology of the working face and the surrounding environment. There should be no obstacles within the excavator's turning radius to avoid scratches or damage to the vehicle.

Configuration notes for equipment

Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:

  • correctly sized main machine for the required output
  • material feeding and conveying system
  • control system with manual and automatic modes
  • wear parts package matched to the material

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the quoted capacity is achievable with your actual material
  • check the core component brands and the wear part material
  • verify the power supply and foundation requirements on your site
  • ask what commissioning and operator training is included
  • confirm spare parts availability and typical delivery time

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.