Product Knowledge

Why does the Sicoma planetary mixer have 3-armed stars while other top mixers in its class have only two?

Home/ News/ Product Knowledge/ Article
Product Knowledge Editorial review by HAMAC
Sicoma’s designers have studied the action of both 2-armed and 3-armed stars and concluded that 3 are better. Not only because there are more arms and blades, but because the blades can be positioned to be much more effective. To start with, the arms can sweep the mixing volume more effectively because the more paths there are, the more times each area can be covered in every minute; this is important because the ARMS do the mixing, the blades giving the fast discharge action. This gives better mixing. Less obvious, however, is the angle of the blade. The combined rotation of star and individual blade across the mixer floor shows that the blades should be angled not at right angles to the star shaft but at a slight inward angle. This gives better sweeping action and eliminates lengthways slicing through the mix, which is ineffective and causes excessive wear. Since the outer edge travels further than the inward edge, it receives more wear. While others add replaceable segments to compensate, these must be bought, stored and installed, while Sicoma has simply thickened this outer edge to compensate correctly and give longest life. Sicoma’s blade arrangement is a better design, gives better mixing and lasts longer with less maintenance.

Configuration notes for mixer

A self-loading mixer removes the need for a separate batching plant and wheel loader on small and remote sites, but the batch cycle is longer, so daily output depends on travel distance on site. In practice, the delivered scope for this type of work usually includes:

  • drum with hydraulic drive and reversible discharge
  • front loading shovel with hydraulic lifting and tipping
  • four-wheel-drive chassis rated for rough site roads
  • weighing and water dosing system for consistent batch quality

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the drum volume and the actual mixed output per batch
  • check whether the loading shovel can reach the aggregate stockpile height on your site
  • verify the chassis and axle rating for the road conditions you will use
  • ask about water dosing accuracy and how the operator sets the mix ratio
  • confirm spare parts availability for hydraulic pumps and drum seals

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Tags :
Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.