First of all, the single cylinder cone crusher uses gear oil. The hydraulic oil tank uses No. 68 gear oil. No. 68 is relatively thin and can be directly used as hydraulic oil. For the lubricating oil tank, we use No. 150 gear oil.

Secondly, No. 32 hydraulic oil is used for the hydraulic oil tank of multiple cylinder cone crusher and 150 gear oil is used for lubricating oil tank.

Therefore, the choice of oil for cone crusher is directly related to the equipment. In terms of the brand, Mobil and Shell can be selected. Single cylinder cone crusher‘s hydraulic oil and lubricating oil should use the same type, but the viscosity is different. Multiple cylinder cone crusher has no restriction on hydraulic oil.

HAMAC is a professional cone crusher manufacturer, with various types of equipment such as single cylinder hydraulic cone crusher and multiple cylinder hydraulic cone crusher. The single cylinder hydraulic cone crusher adopts the integrated design of hydraulic station and lubrication station to save installation space. The multiple cylinder hydraulic cone crusher is equipped with automatic functions such as lubricating oil return flow monitoring, horizontal shaft speed monitoring, vibration monitoring and automatic feeding control to prolong the service life of the equipment.

Configuration notes for crusher

Crusher throughput depends heavily on feed gradation and rock hardness. The same machine can lose 30 percent of its rated capacity when fed oversize or wet, sticky material. In practice, the delivered scope for this type of work usually includes:

  • primary jaw crusher for coarse reduction of run-of-quarry rock
  • secondary cone or impact crusher for shaping and size control
  • vibrating screen with two or three decks and adjustable mesh
  • belt conveyors with magnetic separator and metal detector

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • match the feed opening to the largest lump size your quarry actually produces
  • confirm the closed-side setting range needed for each finished aggregate size
  • check whether the plant is mounted on a fixed foundation or a mobile chassis
  • verify the wear part material for jaw plates and blow bars against your rock abrasiveness
  • ask for the guaranteed throughput at the target product size, not the maximum figure

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.