What Preparations Should Be Made Before Loader Operation?

Home/ News/ Earth-moving Machines/ Article
Earth-moving Machines Editorial review by HAMAC
Before the loader is operated, check the fuel, cooling water and lubricating oil, check the reliability of driving and parking brakes, check the operation of the bucket system when there is no load, and check the loader-related items in the forklift inspection content.

The engine part should be implemented in accordance with the relevant provisions of the general operating regulations, and a signal should be sent before the engine is started or operated. Check the hydraulic system for leakage; the tire excavator should check whether its tires are intact and whether the air pressure meets the regulations; check the transmission, braking system, slewing mechanism, and instruments and meters, and after trial operation, allow entry to work after confirming that it is normal status.

Learn more about the construction tasks and site conditions, check the firmness and stability of the soil where the loader stops. The tire loader should be supported to keep it stable and reliable. Check the stability of the road cutting and trench slope to prevent the loader from overturning. It is strictly forbidden for any personnel to stay in the loader operation area, and irrelevant personnel are prohibited from entering the cab. There should be roads for dump trucks to enter and exit the operation site.

Configuration notes for equipment

Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:

  • correctly sized main machine for the required output
  • material feeding and conveying system
  • control system with manual and automatic modes
  • wear parts package matched to the material

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the quoted capacity is achievable with your actual material
  • check the core component brands and the wear part material
  • verify the power supply and foundation requirements on your site
  • ask what commissioning and operator training is included
  • confirm spare parts availability and typical delivery time

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.