The most critical electrical equipment for concrete batching plant is a microcomputer control system, and its status is good or bad relationship to the yield and quality of the commodity concrete. Domestic commercial concrete mixing plant is basically using a microcomputer control system.
There are basically types:
1. The early weighing instruments SBC system.
2. SBC (with display meter) host computer system.
3. Weighing instruments PLC host computer system.
4. IPC system.
5. Small industrial bus systems.
6. With weighing module (with display meter) the PLC host computer system.
Complex due to the composition of the microcomputer control system, the fault location is also relatively difficult, In order to minimize the loss of production, it is necessary to achieve the rapid detection and location of concrete microcomputer control system failure.
Concrete batching plant microcomputer control system fault detection idea is:
It is familiar with computer control system works as well as a variety of mechanical action of electrical logical relationship,for testing in accordance with the correct electrical fault detection process,the use of the effective means of detection,combined with the logical analysis and judgment,continued to narrow the scope of failure,and ultimately to identify the point of failure.
Configuration notes for batching plant
Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging. In practice, the delivered scope for this type of work usually includes:
- twin-shaft compulsory mixer sized to the rated output
- aggregate batching machine with 3 to 4 hoppers and load-cell weighing
- cement silos with screw conveyors and butterfly valves
- PLC control cabin with automatic and manual operation modes
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
- verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
- check steel plate thickness of the mixer shell and the batching hoppers
- ask which brand of load cells, reducers and pneumatic valves is used
- confirm the control system supports recipe storage and production reports
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.