Concrete pump has already had a history of nearly a hundred years so far. France began to research concrete pump as early as 1907. The French Feliz Haier had designed and manufactured concrete delivery pump in 1927, and achieved the first successful application. In China, concrete delivery pump had been imported from abroad in 1950s. For example, 252 type concrete pump from Soviet Union had been used in the construction of Wuhan Yangtze River Bridge. Because of the deficient conditions at the time, continuous failures of the machine did not cause the attention of construction unit. From the 1960s to early 1980s, many manufacturers produced all kinds of concrete pumps of various displacement and operating methods through imitation, self-development and combining foreign technology. Some of them even passed the national identification, but no one had been widely used.
The large-scale application of concrete delivery pump begun with the project construction of Shanghai Baoshan Iron and Steel Plant in 1979. Bao Steel Engineering imported a DC-S115B concrete pump truck from Japan's Mitsubishi Heavy Industries and equipped it with six cubic meters concrete mixer truck. It was widely used in a variety of large-scale reinforced concrete foundations and other projects, which achieved good results and accumulated a wealth of experience. From then on, Nanjing Jinling Hotel, Shanghai Hotel, Union Building, Beijing Subway and other major projects had successfully used concrete pump, which greatly promoted the advanced method of using concrete pump in construction industry.
Need help applying this to your project?
Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.
Questions about this topic
How do I choose batching plant capacity?
Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.
Which mixer type should I choose for my concrete?
Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.
How often should wear parts be replaced?
Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.
Can the plant be upgraded later?
Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.
H
HAMAC Machinery Editorial Team
Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.