Earth-moving Machines

Selection and reinforcement method of excavator bucket

Home/ News/ Earth-moving Machines/ Article
Earth-moving Machines Editorial review by HAMAC
Due to the requirements of different construction environments, different types of buckets need to be selected, so special attention should be paid when purchasing excavator buckets. When purchasing products, combined with the material and construction environment of the product, the current excavator There are two types of buckets: material type and functional type.

Generally, in the cleaning work of rivers and ditches and the light working environment of sweat and sand, most of the buckets selected are standard buckets. If the construction environment is relatively harsh compared to light work, it is recommended to buy reinforced green peas or It is a gravel-type bucket, which is relatively convenient to use and brings higher construction efficiency. If it is after blasting or in a rocky environment, it is best to choose a rock-type bucket, which will improve work efficiency and reduce digging. Bucket wear.

However, in the process of construction, due to changes in the environment, buying a bucket will increase the work cost. Generally, the bucket will be reinforced to improve the wear resistance of the bucket. Two methods such as welding or reinforcing ribs will be used. The two methods are very effective and enhance the firmness of the bucket, which brings certain economic efficiency to the construction of the project.

In the construction of excavator buckets, the buckets generally selected are more practical construction environments, or when special circumstances are encountered, bucket reinforcement is the most important method, and the degree of wear is significantly reduced.
Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.