Because in Sicoma mixers, the ARMS do the mixing. They cover from top to bottom and every cubic inch of the mixer volume many times each minute. The angled blades create pressure in front and a void behind, drawing material from the top downward behind each arm and mixing material vertically as well as horizontally, which is needed when the depth of mix is high. The high speed creates “Compulsory” mixing action, breaking -up clumps and distributing cement evenly to coat all particles. This creates stronger concrete. Sicoma’s mixers can receive AND MIX their full rated volume – and without any extra mixing time.
Configuration notes for mixer
A self-loading mixer removes the need for a separate batching plant and wheel loader on small and remote sites, but the batch cycle is longer, so daily output depends on travel distance on site. In practice, the delivered scope for this type of work usually includes:
- drum with hydraulic drive and reversible discharge
- front loading shovel with hydraulic lifting and tipping
- four-wheel-drive chassis rated for rough site roads
- weighing and water dosing system for consistent batch quality
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the drum volume and the actual mixed output per batch
- check whether the loading shovel can reach the aggregate stockpile height on your site
- verify the chassis and axle rating for the road conditions you will use
- ask about water dosing accuracy and how the operator sets the mix ratio
- confirm spare parts availability for hydraulic pumps and drum seals
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.