Stationary or mobile ready-mix concrete plants with concreting output of compacted fresh concrete from 30m3/hr to 240m3/hr. Single-Shaft Compulsory Mixer with Double Spiral (The Original) for Batches of 500 to 4000 Liters and Hourly Outputs of up to 240 m3. Automatic control system with integrated sequencing logic for batching control, system featuring fail-safe PLC cards, microcomputer batching system, data processing, concrete consistency control and moisture measuring instrument.
Configuration notes for batching plant
Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging. In practice, the delivered scope for this type of work usually includes:
- twin-shaft compulsory mixer sized to the rated output
- aggregate batching machine with 3 to 4 hoppers and load-cell weighing
- cement silos with screw conveyors and butterfly valves
- PLC control cabin with automatic and manual operation modes
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
- verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
- check steel plate thickness of the mixer shell and the batching hoppers
- ask which brand of load cells, reducers and pneumatic valves is used
- confirm the control system supports recipe storage and production reports
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.