The large concrete pump equipment is suitable for the large-scale concrete construction including building, high-speed road and flyover and so on.
Concrete delivery pump or concrete pump is composed of pump body and pipeline. It is a machine used to convey concrete constantly through pipeline by pressure and mainly suitable for house building, bridge and tunnel construction. So far, it can be divided into sluice valve and S valve concrete pump. Another kind of pump truck puts the pump body on the automobile chassis and is equipped with a concrete placing boom which can be flexible and anaclastic.
Fine Stone Diesel Concrete Pump
Our company is always in line with the principle that honesty is the fundamental to be a man and also the business management of a enterprise. Therefore, the staff should bear in mind principles of “Customer First, Reputation First, Quality First and Service First” and then spread and flourish it. Since the establishment of our company, every member of company is strict with themselves and surpasses themselves. And we pursue higher production capability. We serve for all users with persistent efforts, unremitting self-improvement, higher quality, more moderate price, better service and excelsior working attitude.
Configuration notes for pump
Pumping height and pipeline length reduce achievable output. A pump rated at 60 m³ per hour at ground level will deliver considerably less at 100 metres of horizontal pipeline. In practice, the delivered scope for this type of work usually includes:
- hydraulic pump unit with variable displacement control
- S-valve or gate valve with hardened wear plates and cutting ring
- delivery pipeline sized to the concrete mix and vertical lift
- outrigger frame and stabilisers for safe placement
Site and operating conditions
Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the output and pressure figures are quoted at the required horizontal and vertical distance
- check the maximum aggregate size the pump handles with your mix design
- verify the pipeline diameter matches the slump and aggregate of your concrete
- ask about wear plate and cutting ring life under your aggregate type
- confirm after-sales support and spare parts for the hydraulic system
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.