Inside the HAMAC spare parts centre: which wear parts are stocked, how first-service kits are assembled, and how dispatch is planned to keep a customer's plant running.
Why wear parts decide uptime
A batching plant or crusher does not fail all at once. It loses performance gradually as blades, liners, belts and screens wear. The cost of a short downtime on a commercial concrete contract is usually far higher than the price of the parts themselves, which is why stock planning is treated as a engineering task rather than a warehouse task.
HAMAC groups spare parts by service interval. Parts that wear within the first year are identified at the time of sale and offered as a kit, so a customer is not waiting for individual items to be sourced from different suppliers.
Spare parts and wear components stored at the HAMAC service centre
How a first-service kit is assembled
The kit is built around the delivered configuration, not a generic list. For a batching plant it typically includes mixer blades and liners, belt scrapers, weigh-bucket seals and a set of bearings and seals for the conveyor rollers. For a crusher it centres on mantle and concave liners, bearing seals and the drive belt set.
Mixer group: blades, side liners, bottom liner, shaft seals
Conveyor group: belt scrapers, idlers, drive belt
Weighing group: load cell seals and calibration weights
Crusher group: mantle, concave, eccentric bearing seal
Dispatch planning and lead time
Common wear parts are held in stock and can ship within a few working days. Non-standard items, such as a liner for an older crusher model, are made to order and may take two to four weeks. Customers are advised to order before the wet or peak season, when freight and customs clearance take longer.
HAMAC concrete batching plant - 5 supplied by HAMAC.
Need help applying this to your project?
Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.
Questions about this topic
Which spare parts should I buy with a new plant?
Buy a first-service kit matched to your configuration: mixer wear parts, conveyor belts and scrapers, weighing seals and a set of common bearings and seals.
How fast can spare parts ship?
Stocked wear parts normally ship within 3 to 5 working days; made-to-order components may take 2 to 4 weeks depending on the part.
Do you supply parts for older HAMAC machines?
Yes. Keep the machine serial number and the part number or a photo of the worn part, and the service team can identify the correct replacement.
H
HAMAC Machinery Editorial Team
Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.