HZS50 concrete batching plant and DHBT40 diesel concrete pump to SOUTH SUDAN is part of HAMAC's ongoing record of concrete batching plant deliveries and application notes. This page sets out what the project involved, how the equipment was configured, and which details buyers should check when planning comparable work in Sudan or elsewhere.

Project background and project scope

The requirement came from a contractor preparing to supply road construction with a steady flow of concrete rather than buying from a distant ready-mix supplier. The starting point was not a machine model but a production requirement: what volume is needed per day, what material is available locally, and how much space the site can allocate to the plant.

The enquiry was reviewed against site drawings, power supply details and the planned working schedule before any equipment was proposed. These inputs decide whether a standard configuration is adequate or whether the plant needs a wider batching machine, additional silos, a different mixer type or a modified discharge height.

Equipment configuration

The delivered configuration centred on the concrete batching plant and its supporting systems. The main items were:

  • twin-shaft compulsory mixer sized to the rated output
  • aggregate batching machine with 3 to 4 hoppers and load-cell weighing
  • cement silos with screw conveyors and butterfly valves
  • PLC control cabin with automatic and manual operation modes

Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging.

Site conditions and engineering adjustments

The working environment in Sudan brought high daytime temperatures, abrasive dust and limited water supply, so cooling capacity, air filtration and dust control carry more weight than in temperate markets. The configuration was adjusted accordingly rather than shipped as a catalogue standard.

Access roads and lifting capacity at the site were reviewed so that the largest transportable component could be delivered without re-engineering on arrival.

Commissioning, training and support

Commissioning followed a written checklist covering mechanical alignment, electrical termination, weighing calibration, dry-run testing and first production batches.

Operator training covered daily checks, recipe entry, manual override procedures and the actions to take if a weighing error or blockage occurs. Records of the calibration values were handed over with the machine so that future adjustments start from a known baseline.

What buyers should check before ordering

Based on this project and similar deliveries, the following points are worth confirming at quotation stage:

  • confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
  • verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
  • check steel plate thickness of the mixer shell and the batching hoppers
  • ask which brand of load cells, reducers and pneumatic valves is used
  • confirm the control system supports recipe storage and production reports

Key takeaways

  • Start from daily output and material, not from a model number.
  • Confirm that quoted capacity matches your real material and site conditions.
  • Allow for climate, power supply and transport access in the configuration.
  • Budget for wear parts and a spare parts kit from the first year of operation.

For a comparable project, HAMAC can review your requirement and propose a configuration with a clear scope, delivery schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.