On July 24, 2021, three 40-foot containers full of HAMAC equipment were sent to Qingdao Port for loading, and the final destination was Port Sudan, Sudan. Inside the container is a set of YHZS35 mobile concrete batching plant and a unit of DHBT40 concrete pump. According to the customer's needs, we gave the customer two solutions. In the end, the customer decided to use the plan A, which is to install a detachable extended discharge chute under the mobile ready mixed station. The finished concrete can be transported by the trailier concrete pump, or directly unloaded into the transit mixer truck when removing the chute.

As a supplier of concrete equipment with many years of experience, HAMAC not only provides equipment, but more importantly, we provide customized solutions for customers. We are not limited to one choice for customers, but provide customers with different levels of solutions according to their needs, so that customers can compare and choose the most suitable solution for their own projects.

Configuration notes for batching plant

Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging. In practice, the delivered scope for this type of work usually includes:

  • twin-shaft compulsory mixer sized to the rated output
  • aggregate batching machine with 3 to 4 hoppers and load-cell weighing
  • cement silos with screw conveyors and butterfly valves
  • PLC control cabin with automatic and manual operation modes

Site and operating conditions

Equipment working in Sudan has to deal with high daytime temperatures, abrasive dust and limited water supply, so cooling capacity, air filtration and dust control carry more weight than in temperate markets. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
  • verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
  • check steel plate thickness of the mixer shell and the batching hoppers
  • ask which brand of load cells, reducers and pneumatic valves is used
  • confirm the control system supports recipe storage and production reports

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.