Company News

WZ40-28 Backhoe Loader was delivered to Ghana

Home/ News/ Company News/ Article
Company News Editorial review by HAMAC

18th , January, 2022, HAMAC disassembled the wheels of a WZ40-28 backhoe loader and put it in a 40ft containter. This customer is a big fan of HAMAC and has purchased our products many times. This is the 4th order he placed since 2020.

The sea freight remains very high, our client has to pay high freight if loading by ro-ro ships. In comparison, loading in a 40ft container costs less. In order to help customers save some freight, we removed all the wheels of the backhoe loader and installed craft wheels to facilitate loading, and also facilitate customers to drive it out of the container.

In the construction of infrastructure, the backhoe wheel loader always plays an important role. It has a bucket of 1m3 at the front end, which can load and unload various materials. The rear end is equipped with a 0.3m3 bucket, which can excavate at a maximum depth of 4.5 meters, and the digging arm can be rotated at 190 degrees, which is convenient for multi-directional operations. The 100hp Cummins engine allows the machine itself to obtain enough power. In addition, the engine parts are easy to buy locally, which also attracts our client.

Configuration notes for equipment

Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:

  • correctly sized main machine for the required output
  • material feeding and conveying system
  • control system with manual and automatic modes
  • wear parts package matched to the material

Site and operating conditions

Equipment working in Ghana has to deal with high humidity and heavy seasonal rain, which makes corrosion protection, electrical enclosure sealing and drainage around the foundation important details rather than afterthoughts. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the quoted capacity is achievable with your actual material
  • check the core component brands and the wear part material
  • verify the power supply and foundation requirements on your site
  • ask what commissioning and operator training is included
  • confirm spare parts availability and typical delivery time

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.