HAMAC Shines at CONSTRUCTO 2025

Home/ News/ Company News/ Article
Company News Editorial review by HAMAC

HAMAC Shines at CONSTRUCTO 2025 is part of HAMAC's ongoing record of stone crushing plant deliveries and application notes. This page sets out what the project involved, how the equipment was configured, and which details buyers should check when planning comparable work in Mexico or elsewhere.

Project background and project scope

The customer approached HAMAC after comparing several quotations and finding that the configurations were not directly comparable. The starting point was not a machine model but a production requirement: what volume is needed per day, what material is available locally, and how much space the site can allocate to the plant.

A short technical questionnaire covering material, output, power supply and site layout was completed before the layout drawing was issued. These inputs decide whether a standard configuration is adequate or whether the plant needs a wider batching machine, additional silos, a different mixer type or a modified discharge height.

Equipment configuration

The delivered configuration centred on the stone crushing plant and its supporting systems. The main items were:

  • primary jaw crusher for coarse reduction of run-of-quarry rock
  • secondary cone or impact crusher for shaping and size control
  • vibrating screen with two or three decks and adjustable mesh
  • belt conveyors with magnetic separator and metal detector

Crusher throughput depends heavily on feed gradation and rock hardness. The same machine can lose 30 percent of its rated capacity when fed oversize or wet, sticky material.

Site conditions and engineering adjustments

The working environment in Mexico brought high daytime temperatures, abrasive dust and limited water supply, so cooling capacity, air filtration and dust control carry more weight than in temperate markets. The configuration was adjusted accordingly rather than shipped as a catalogue standard.

Foundation drawings were issued in advance so that civil work could proceed in parallel with production, which shortens the gap between delivery and first concrete.

Commissioning, training and support

The plant was tested empty first, then with aggregate only, and finally with a full mix design so that the operator could see the complete cycle before production started.

Operator training covered daily checks, recipe entry, manual override procedures and the actions to take if a weighing error or blockage occurs. Records of the calibration values were handed over with the machine so that future adjustments start from a known baseline.

What buyers should check before ordering

Based on this project and similar deliveries, the following points are worth confirming at quotation stage:

  • match the feed opening to the largest lump size your quarry actually produces
  • confirm the closed-side setting range needed for each finished aggregate size
  • check whether the plant is mounted on a fixed foundation or a mobile chassis
  • verify the wear part material for jaw plates and blow bars against your rock abrasiveness
  • ask for the guaranteed throughput at the target product size, not the maximum figure

Key takeaways

  • Start from daily output and material, not from a model number.
  • Confirm that quoted capacity matches your real material and site conditions.
  • Allow for climate, power supply and transport access in the configuration.
  • Budget for wear parts and a spare parts kit from the first year of operation.

For a comparable project, HAMAC can review your requirement and propose a configuration with a clear scope, delivery schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.