Company News

48m Truck Mounted Boom Pump is shipped to Cayman Islands

Home/ News/ Company News/ Article
Company News Editorial review by HAMAC

On March 6, 2021, a 48-meter Truck Mounted Boom Pump slowly drove out of HAMAC factory. It will be bound for Shanghai port, take a ro-ro ship, and finally be sent to the Cayman Islands.

This boom pump truck adopts SINOTRUCK HOWO chassis, T7H, 400HP, PUSH main hydraulic oil pump, RADK-TECH boom multi-way valve, Italy NEM Boom balance valve, Italy WALVOIL support leg multi-way, American Parker oil cylinder hydraulic seal parts, XIELI Main oil cylinder, JIE brand transfer case, EATON hose joint, etc.

HAMAC manufactures concrete pump trucks of 30-70m. If you already have a truck chassis, as long as the truck has PTO on it, we can also customize the boom pump part according to your chassis.

Configuration notes for pump

Pumping height and pipeline length reduce achievable output. A pump rated at 60 m³ per hour at ground level will deliver considerably less at 100 metres of horizontal pipeline. In practice, the delivered scope for this type of work usually includes:

  • hydraulic pump unit with variable displacement control
  • S-valve or gate valve with hardened wear plates and cutting ring
  • delivery pipeline sized to the concrete mix and vertical lift
  • outrigger frame and stabilisers for safe placement

Site and operating conditions

Equipment working in Italy has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the output and pressure figures are quoted at the required horizontal and vertical distance
  • check the maximum aggregate size the pump handles with your mix design
  • verify the pipeline diameter matches the slump and aggregate of your concrete
  • ask about wear plate and cutting ring life under your aggregate type
  • confirm after-sales support and spare parts for the hydraulic system

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.