2 units of bolted type cement silo are delivered to Ulaanbaatar, Mongolia

Home/ News/ Company News/ Article
Company News Editorial review by HAMAC

On 17th, March, 2021, 4 sets of flatbed truck fully loaded with 2 units of 700ton bolted type cement silos left our factory heading for the border port-Erlian city. These vehicles will transfer at Erenhot, and the final destination is Ulaanbaatar, Mongolia. The two devices were set as early as October 2020. Due to the outbreak of the epidemic, the customer was unable to arrange vehicle pickup until March.

We use WAM's pulse dust collector, safety valve, butterfly valve, material level gauge and arch breaking device for these two silos. Regarding the screw conveyor, we also equip our customers with the well-known brand SICOMA. Besides, we do complete sand blasting before painting for our cement silos to remove the rust complete, increase paiting surface ahdesion, and prolong the service life.

We always believe that only high-quality equipment and responsible services are the long-term solutions for the company's development. We refuse to take advantage of inferior products and prices below the market. If you want to get cost-efficient concrete equipment, you are welcome to come to HAMAC for consultation.

Configuration notes for equipment

Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:

  • correctly sized main machine for the required output
  • material feeding and conveying system
  • control system with manual and automatic modes
  • wear parts package matched to the material

Site and operating conditions

Equipment working in Mongolia has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the quoted capacity is achievable with your actual material
  • check the core component brands and the wear part material
  • verify the power supply and foundation requirements on your site
  • ask what commissioning and operator training is included
  • confirm spare parts availability and typical delivery time

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.